The crates have gone into the lorry today. It may be some time before I see them again as we still haven't exchanged on our Teignmouth house.
Featured post
Pentewan Light Railway
The Pentewan Railway in Cornwall was possibly unique in having three* gauges in its lifetime. Christopher Hawkins built the original rai...
Monday, 11 January 2021
Wednesday, 6 January 2021
PLR Ready for transit
It took several days to separate all the boards and get them downstairs and then dismantle and clear all the staging and workbench etc. Here are some photos of the progress.
All the boards downstairs into the conservatory:
Crated up ready for transit:
What a nice railway room it would make! However, I don't think the new owners are that minded. This room was actually one of the reasons we (well me) wanted to buy the house all those years ago. It didn't have the floor boards nor insulation then. Note the water tank that dictated the big hill and the track spiral which tunnelled down behind it.
So Devon next!
Saturday, 28 November 2020
PLR on the move
So the time has come to consider how to get the PLR out of the loft and crated up ready for the move to Devon. Here are some pics of it in the loft before dismantling it and getting the boards downstairs for packing - and the rest of 30 years worth of accumulated rubbish treasures. My plan is to assemble the boards with added wooden framing to make 3 or 4 crates.
Friday, 11 January 2019
K1 rechip
Although it is a heavy engine with common pickup on all 8 wheels it still suffered a little from power dropouts which mainly manifested itself in spluttery sound. Therefore the rebuild includes adding stayalives in the form of a bank of 4 x 220uf tantalum capacitors per engine.
I stripped out the memory wire rigging that operated the valve gear (forward/reverse) as it never really worked satisfactorily. However I still have a hankering to make this work so have acquired two of these tiny servos:
![]() |
Specification:
Weight: 1.7g
Speed: 0.07sec 60deg @ 2.8v / 0.05sec 60deg @4.2v
Torque: 0.05kg @ 2.8v / 0.075kg @ 4.2v
Dead Band: <4us
Dimensions: 13 x 16 x 6mm
Plug: Micro JST - 1.25 Pitch
|
Friday, 28 April 2017
Now here's a trackwork challenge
I modelled trams in my youth and could be tempted again one day to try and replicate the type of scenes below.
Thursday, 27 April 2017
Lynton in O14
It is an exact to scale model of Lynton station in late SR period which just fits on five 4ft boards. It was an interesting project requiring a surprising amount of research and I owe my thanks to the many experts on the Yahoo ExmoorNG and L&B Modelling groups - and not forgetting Measured and Drawn.
I battled with Templot to produce the plans but when it actually came to tracklaying I found these lacking and redrew much of the pointwork on plain sheets of paper.
Most of the track is SR style but with some of the sidings in original L&B style. Rail is Karlgarin code 82/7, SR baseplates are KBscale, SR sleepers are a specially cut section by Twigfolly, original sleepers are coffee stirrers, spikes are home made from staples, fishplates are from Zamzoodled. All track is laid on a thin foam base.
Hopefully when the whole layout is finished (he's in no hurry) I will get the chance to help the owner exhibit it.
| The approach |
| The bay and loop turnouts (engine shed road yet to be built) |
| The loop and engine shed turnout |
| The crossover and goods shed turnout - very tricky to get right |
|
| The goods yard of mostly L&B style track (buildings not made by me) |
| SR track above - L&B below |
| Closeup of crossing |
| Closeup of switches |
Thursday, 29 December 2016
Another visitor to the PLR
David John's K1 (built by Paul Berntsen) came to visit the PLR over Christmas. This is it trying out the big climb (1 in 28 with 26" radius reverse curves) with a few wagons on the back: http://youtu.be/ypnf0ot11tM
And a couple of shots of it posed with mine (I can't actually run them together as mine is DCC and David's is DC)
Sunday, 27 November 2016
More Lynton Trackmaking
Wednesday, 29 June 2016
Trackmaking for Lynton
Here are a few shots of the first turnout under test and the common crossing under construction for the next.
Tuesday, 3 May 2016
PLR Model Size and Statistics
The key statistics are:
Overall Size: 18ft x 14ft
NG full circuit: ~ 80ft
NG mainline maximum grade: 1 in 28 (3.5%) - from lower tunnel exit to quarry loop
NG mainline minimum radius: 27in - the big spiral and a small section c. 22in between quarry and viaduct.
The quarry lines are much steeper and tighter.
SG end to end length: ~30ft
SG maximum grade: 1 in 25 (4%) - mainly in hidden track





























